This guidance applies solely to FCC-proposed communication tower actions in the Service’s Asheville Ecological Services Field Office work area: Alexander, Alleghany, Anson, Ashe, Avery, Buncombe, Burke, Cabarrus, Caldwell, Catawba, Cherokee, Clay, Cleveland, Davidson, Davie, Forsyth, Gaston, Graham, Haywood, Henderson, Iredell, Jackson, Lincoln, Macon, Madison, McDowell, Mecklenburg, Mitchell, Polk, Rowan, Rutherford, Stanly, Stokes, Surry, Swain, Transylvania, Union, Watauga, Wilkes, Yadkin, and Yancey counties, North Carolina.
Use of this guidance for actions beyond its intended scope and purpose will not justify “no effect” determinations and may invalidate biological conclusions pursuant to ESA. The Service reserves the right to update, modify, or revoke this guidance at any time.
Authorities: National Environmental Policy Act and section 7 of the Endangered Species Act of 1973, as amended (ESA); the Migratory Bird Treaty Act, as amended (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA)
The Federal Communications Commission (FCC) authorizes communication tower projects, including new tower construction, antenna co-location on existing structures, and the repair, maintenance, or relicensing of existing towers. The ESA requires federal agencies to identify the effects of actions they fund, authorize, or implement on federally threatened or endangered species and designated critical habitat (formally designated areas with physical or biological features essential to the conservation of listed species that may need special management or protection. Federal agencies must ensure their actions do not appreciably diminish the value of critical habitat for listed species. Designated critical habitat has a legal status and definition and is not synonymous with “suitable habitat”. If a project overlaps critical habitat, a separate analysis and determination about whether the project will destroy or adversely modify this designated critical habitat is required). If a federal agency finds its actions “may affect” a listed species or critical habitat, additional consultation with the U.S. Fish and Wildlife Service (Service) is required. If a federal agency determines its action will have “no effect” on listed species or critical habitat, no consultation with the Service is needed.
To assist the FCC, or its designee, the Service offers the following guidance on determining whether a project will have “no effect” on a listed species or designated critical habitat. A “no effect” determination is the appropriate conclusion when the action agency, or its designee, determines its proposed action will not affect, positively or negatively, a listed species or designated critical habitat. For an action agency to determine if any activities will have “no effect” on listed species or designated critical habitat in the action area, the action agency must make that determination for ALL species and critical habitats in the action area.

The Service has no objection to a “no effect” determination in the following scenarios:
- Proposed actions with an action area outside the species’ range as defined by the Service’s Information for Planning and Consultation (IPAC) project planning tool. IPAC identifies threatened, endangered, and proposed species, as well as proposed and designated critical habitat, that may occur within the action area, i.e., all areas to be affected directly or indirectly by the Federal action and not merely the immediate area involved in the action (50 CFR §402.02). Action area is not limited to the "footprint" of the action, nor is it limited by the Federal action agency's authority) of your proposed project and/or may be affected by your proposed project.
- Co-location of a new antenna or equipment on an existing structure (e.g., light pole, billboard, water tower, building) as long as there is no additional ground disturbance and total tower height, including appurtenances, remains at or below 199 feet.
- Repair, maintenance, or replacement of an existing communication tower. This work must not include: increasing the tower or associated infrastructure footprint (including access road), ground disturbance (including access road) outside the original footprint, or increasing the tower height to above 199 feet overall (including appurtenances).
- Proposed actions with an action area that includes no suitable habitats for listed species, as determined by a suitable habitat assessment (suitable habitat assessments provide information on the natural communities present and help determine which federally listed species may occur in the action area. Assessments involve data from desktop evaluations and field visits, comparing suitable habitat components to existing conditions to determine whether suitable habitats are present for the species of interest. Habitat components must exist in sufficient quantity, quality, and arrangement to support a species for the habitat to be considered suitable.).
- Proposed actions that are consistent with a “no effect” determination via an applicable Determination Key in IPAC.
- Proposed actions with an action area that occurs within the footprint of an extant structure or within an extant road prism (A road prism is the total three-dimensional cross-section of a road, spanning from the top of the cut slope to the toe of the fill slope. It includes the driving surface, shoulders, ditches, slopes, and structural fill, representing the entire area directly disturbed by road construction), and the effects of the action (Effects of the action are the direct and indirect effects of an action on the species or critical habitat, together with the effects of other activities that are interrelated or interdependent with that action.) do not extend beyond that footprint or prism.
- Proposed actions with an action area that is entirely within a previously disturbed (Previously disturbed for this guidance refers to areas where human activity, such as construction, mining, agriculture, or infrastructure development, has significantly altered the natural soil profile, topography, native vegetation, water quality, stream substrate, biological processes, or has otherwise degraded habitats to the extent that they cannot support one or more federally protected species. These sites often have compacted soil, invasive species, and a lack of original plant communities. Exceptions include rights-of-way where suitable habitat for prairie remnant species may occur.) area.
If the FCC, or its designee, determines there is "no effect" on listed species or designated critical habitat, ESA section 7 consultation is not required. The determination should be documented in the FCC’s or its designee’s files, citing one of the scenarios listed above. The FCC or its designee does not need to notify or seek our concurrence, just as the Service is not obligated to review or comment.
If the tower project does not fit into a scenario listed above, the FCC or its designee will complete a separate environmental review for the proposed actions and submit it to the Asheville Ecological Services Field Office. Additionally, this guidance does not apply to towers over 199 feet in height or guyed towers.
Regardless of consultation needs, the Service recommends the following guidance be incorporated into tower design and construction:
- Recommended Best Practices for Communication Tower Design, Siting, Construction, and Operation
- FAA Advisory Circular - Obstruction Marking and Lighting (leaving the U.S. Fish and Wildlife Service website)
- Avoidance and Minimization Measures: Communications Towers